Wind Turbine Installation

Wind Turbine Installation 2018-06-07T15:41:42+00:00

Any wind turbine insatllation needs to be carefully designed, planned and executed.

At Sustainable Energy Systems Ltd, every renewable installation that we carry out is undertaken by our own dedicated factory trained staff. Our certified installation team are on hand to give you full confidence in a job well done.

Prior to the installation works starting we confirm the schedule of works with the client including: cable routing, exact turbine positioning and meter location.

The renewable installation of a wind turbine is carried out in 2 stages as follows:

  • Groundworks – This includes trenching and digging works, installation of steelwork/foundation kit, laying of cable and concreting.
  • Installation – This includes the crane works, installation of the turbine and associated electrical components, electrical connection works and commissioning of the wind turbine

Once planning and grid connection approval have been obtained, the standard installation timescale for a wind turbine is:

  • Groundworks to commence within 3-4 weeks from receipt of signed contract
  • Installation to commence within 3-4 weeks of completion of groundworks.

For a solar photovoltaic system, we aim to commence works within 3-4 weeks from receipt of signed contract.

The length of time the installation works takes will depend on the size of the system being installed.

On commissioning of your installation, SES Ltd will provide you with an MCS Certificate which guarantees that the product and the installer conform to a rigorous set of standards.